Project
S3 is a 9storey building for office use, with restaurant and flexible retail, business, non-residential institutions and assembly and leisure at ground floor level.
Building specifications
- Unitised curtain wall system with glazed infills, scalloped profiled terracotta on serrated shaped spandrels, projecting vertical aluminium fins, sills and horizontal copping.
- Double-glazed proprietary capped aluminium ‘stick’ curtain wall system. Horizontal and vertical insulated pressed aluminium infill panels.
- Proprietary horizontal extruded louvres system. Side hung doors.
- Prefabricated unitised window panels to stair and lift core – Prefabricated unitised panels forming punched windows to stair core.
- Double glazed capped-fixed aluminium stick curtain system
- Terracotta rainscreen cladding
10.100 sqm
worked area
2023
finished date
42 wks
execution time