Project
The Trinity Island site is situated on the coast of the river Irwell, in Manchester. It comprises four residential towers with varying heights, ranging from 39 to 60 storeys, and includes a total of 1,950 new, high-quality apartments.
Execution times:
Tower D2, 55 floors, 21000 sqm
Tower D1, 61 floors, 22840 sqm
Building specifications
- Unitised structurally silicone glazed system with fixed triple vision glazing, ceramic back painted vision panels, insulated metal panels or glass with inward side hung window with external perforated aluminium sheet
- On convex elevations there are vertical fins
- Double and Single Stick System with DGU and external aluminium fins
- Aluminium Soffits
- Aluminium rainscreen
44.000 sqm
worked area
On going
122 weeks
execution time