Project
The development of Colliers Yard is a new and vibrant neighbourhood located in Greengate; an area steeped in industrial heritage in Manchester city centre.
Bankside stands tall at 43 storeys with a total of 444 flats, featuring a range of 1, 2 and 3-bedroom luxury apartments and penthouses, along with an exceptional level of residential amenity.
Building specifications
- Unitised curtain wall system with glazed infills
- Unitised curtain wall system with metal spandrel panels
- DGU toggle fixed aluminium stick curtain wall system with horizontal and vertical insulated pressed aluminium infill panels, horizontal extruded louvres system.
- DGU capped fixed aluminium stick curtain wall system with horizontal and vertical insulated pressed aluminium infill panels, horizontal extruded louvres system
15.600 sqm
worked area
On going
80 wks
execution time