Project
The new development is one of the first in the UK to achieve both BREEAM Excellent and LEED Platinum. These two systems, which measure how green a building is, are expected to award the building high scores for its low impact on the environment.
Building specifications
-
Unitized curtain walling system
-
with fixed and openable glazed panel
-
with double glazed infill panels in fixed and operable window configuration
-
-
Unitized curtain walling system with opaque infill panels and external aluminium cladding
-
Toggle curtain walling system
-
Glazes balustrade formed from cantilevered laminated heat strengthened glass fixed to aluminium clamp support at base
-
Fascia balcony
-
Aluminium curtain walling system with lift and slide door, double glazed panels.
20.681 sqm
worked area
2018
estimated Date
75 weeks
execution time