Project
At the core of the concept for the scheme is the ambition to bring cohesion to a disparate campus; integrating existing buildings with new central student facilities. These links provide fluid movement across the new campus for the first time, where academic spaces co-exist with social areas for the enjoyment of students and staff alike.
Building specifications
- Fibre reinforced ventilated walls
- SSG unitised system
- Grid and panel system
- Sunshading system consisting of patterned toughened glass and vertical aluminium brise soleil
- Glazed roof
15.000 sqm
worked area
2014
finished date
72 weeks
execution time